We'd like to relocate the bins and bike racks to tidy up the area and make better use of the space. It has grown into a proper little project rather than a workday job - there is groundwork involved and a decision to make about where the spoil goes.
What's involved
- Lay a slab roughly 4 inches deep.
- Build a low wall or fence, around 5 blocks high.
- Decide where the soil that comes out should go.
Cost to be confirmed.